GOLD · COPPER · SILVER
Gold confirmed by drilling on just 3% of a 15,381 ha permit on Sweden's Gold Line — with a 5 km till anomaly and strong gold grades at surface still to be traced to their source
Klippen has had the expensive step done: one drill program confirmed a gold system in more than half its holes and at every prospect it tested. It never looked beyond a 3.6 km strip, while the till anomaly runs for more than 5 km and gold-bearing boulders of a different chemistry lie 5 km from the nearest hole.
The question is not whether there is gold here. It is where the till and the boulders come from, and the first answers come cheaply, from sampling up-ice and from core that has already been drilled.
Project highlights
| The position | Exploration permit 2026:136 — 15,381 ha in Åsele and Örnsköldsvik municipalities, granted 11 September 2026 and valid to September 2029, covering gold, copper, silver, lead and zinc. At the southern end of the Gold Line, about 50 km south of the Fäboliden gold deposit, with road access |
|---|---|
| Commodity | Gold first. Float at Thor adds copper, silver and tungsten |
| Gold in the drilling | 13 of 22 holes cut gold above 1 g/t Au, at all three prospects. At Odin, KP007 returned 20.0 m at 0.82 g/t Au from 66 m, including 3.78 m at 3.37 g/t; KP015 7.4 m at 1.01 g/t and KP018 8.6 m at 0.97 g/t. At Thor, KP020 returned 0.50 m at 31.4 g/t and KP010 0.35 m at 19.3 g/t — historic downhole lengths |
| Three percent drilled | 22 diamond holes for 4,652 m, 2017–2018, all inside a 3.6 by 1 km strip covering about 3% of the permit. No core hole has been drilled since |
| A target larger than the drilling | A gold-arsenic till anomaly more than 5 km long and about 350 m wide. Ice moved from the northwest, so its bedrock sources should lie up-ice. Gold-bearing boulders grading 5.96 g/t Au lie 5.3 km southeast of the drilling |
| The core is under-read | Four holes were assayed over less than 30% of their length, and two still hit gold: KP022 returned 1.15 m at 1.61 g/t Au, and the only hole at Loki, with about 20 m of its 300 m assayed, returned 0.6 m at 1.06 g/t Au |
The opportunity
Why partner on Klippen
Gold proven in core
Gold at all three prospects drilled, in 13 of 22 holes, with high-grade intervals to 31.4 g/t Au.
Room to grow
97% of a 15,381 ha granted permit has never been drilled.
A large target still to be sourced
A gold-arsenic till anomaly more than 5 km long, with its bedrock source up-ice and still to be found.
Strong grades at surface
Gold-bearing boulders and float near 6 g/t Au, in two distinct styles.
A low-cost start
Unsampled core, boulders and till can be worked before a single new hole is drilled.
The right address
Sweden's Gold Line, a granted permit to 2029 and public road access.
Regional overview
Location Map

District setting
Åsele and Örnsköldsvik municipalities, northern Sweden
Klippen lies at the southern end of the Gold Line, the gold belt of southern Västerbotten, on the county line with Västernorrland, about 20 km east of Åsele and 50 km south of the Fäboliden gold deposit. The permit is crossed by public roads in managed forest country.
Partner diligence
Request the full evaluation brief.
The full evaluation brief — tenure, drilling record, gold-evidence audit, gated programme and source register — is available to qualified counterparties under confidentiality.
Request evaluation brief